Within several days representatives of SJ Company held technical diagnostics of twin cementer UN-2-600.
Let us recall that given modification refers to the new generationline, this modern equipment is a result of Drillife Max joint cooperation with SJ Company, the world leader in oil-field equipment production. So far the company has only several such units.
The machines were purchased last year. That was also whenthey passed the industrial test and were brought into operation.
Within 6 months such operations as cementing of conductor pipe, surface casting, liner and production casting were performed to the clients. The equipment was operated on thedeposits.
In the course of their visit the international specialists carriedout spools tests, the equipment checkout, full range of required testing and operations and provided maintenance advice.
Upon the test completion the equipment was returned to the oilfields.
